Apr 23, 2008 / TP v.2.9

Added features


- Test Track Pro Integration
- Plugin that imports bugs from TTP
- Sync bugs custom fields in TTP plugin
- Sync bugs Comments in TTP plugin
- As a user I should be able to navigate to TTP bug from TP

- Visual Studio 2008 Add-In
- As a user I want to see my ToDo list in Visual Studio 2008
- I want to change state in ToDo in Visual Studio 2008 plugin
- I should be able to install VS 2008 plugin
- I want to track time in VS 2008 plugin

- Replace Release Plan in Project area with Release Plan from Program area
- Ability to filter out "done" work items in Progress report
- Quickly add tasks when adding/editing user story
- Permissions to Comments and Attachments
- Test Cases prioritization
- Last Comments Dashboard component
- Projects prioritization
- Number Custom Field

Fixed bugs


#4703 It should be possible to sort the User Stories in the Task Board based on the Rank
#4718 Disable Custom Field in Lists for RichText type
#4754 Custom Reports: The user must have the ability to filter assignables by entity type
#5138 User receives ${login} in notification emails instead of correct login information
#5175 User receives two the same emails
#5180 Exception while try to login to HD portal
#4820 Add Feature Look up in Filter into Assign test cases page
#4816 Add URL validation for URL field in add/edit company
#5115 I can bind email to not existing entity.
#4873 Closed user stories should not be in backlog in Release Plan
#4875 Disable check box 'Required' for Rich Text Custom Field

0 Comments:

Post a Comment

<< Home

 

This blog contains all TP v.2 releases. You may subscribe to it to get notified about all minor and major updates.

TP v.2 online demo
TP v.2 quick tour